News
Case Study: 10 Logging Trailers for Forestry Operations in Russia
Project case study: 10 logging trailers shipped to Russia for forestry operations. Part of 30,000+ unit annual export operations to 40+ countries.
This case study documents a project shipping 10 logging trailers to Russia, part of operations exporting over 30,000 units annually to 40+ countries.
Project Overview
Client type: Forestry company
Destination: Irkutsk, Russia
Purpose: Raw log transport from forest to sawmill
Quantity: 10 units
Lead time: 45 days
Specifications Delivered
- Model: heavy-duty logging trailer, 50 tons capacity
- Frame: reinforced Q345B steel, 12mm
- Stanchions: hydraulic, 6 sets
- Axles: BPW 16T (3 axles)
- Cold-climate package: low-temperature hydraulic oil, heated valves
- Tires: 12R22.5 winter-rated
Shipping Process
Shipped from Lianyungang Port to Vladivostok, then by rail to Irkutsk. Russian GOST certification completed.
Customer Outcome
The trailers have been operating in Siberian winter conditions (-35°C) for 16 months. Cold-climate package has prevented hydraulic failures. Customer reports 25% higher log volume per trip compared to previous equipment.
Why This Case Matters
Demonstrates our cold-climate engineering capability – a specialized segment of the 30,000+ unit annual export operations.